Your browser is out of date.

You are currently using Internet Explorer 7/8/9, which is not supported by our site. For the best experience, please use one of the latest browsers.

banner
Houston Coil Storage Facility

Facility Specifications

We offer multiple loading bays for receiving and shipping to minimize delays in unloading & loading times. Located on the East Side of Houston near the ship channel adjacent to the Port of Houston.

Request a Quote
Coil Processing Center

Facility Capabilities

  • Large Processing, Handling and Storage Capacity
  • Over 250k sqft of inside storage (Insulated buildings with condensation/humidity control and air rotator systems)
  • 11 acres of outdoor storage
  • Direct barge, rail and truck access
  • 3 large Manitowoc 4100 crawler cranes (200-ton max capacity ) for outdoor activities including barge/rail unloading
  • Multiple Overhead cranes ranging from 10 to 35 tons
  • Large Forklift Capacity (up to 65K)
  • Barcoding inventory control system with online customer access
  • On-line services
  • EDI Capabilities
Ready to get started? 713-450-8401